The first day of our weekend work party was a huge success! Not only did we make big in roads into laying our granite scrap tile floor, but the entire upstairs is now primed and ready for paint and the crushed stone is distributed onto our driveway.

Laying out 2′ square chalk lines for the granite counter top scrap floor. The 2′ square pattern was chosen because it is about as much as can be lifted by one person on a pallet.

Jay Julie and Sue working on assembling segments for the floor. They are working with 2′ square pallets which will be carried in when they are done. More pallets are being made in the background.

The work party from the second floor window. Our powerful tile saw is visible in the lower part of the image. It has a 12″ diamond blade and can slide 3′.









Everything is looking AMAZING. I love the start of the floor. We miss you. I hope we can get together soon!