Finish carpentry (Dec-Jan 2011-12)

I never did put up any pictures up of the finish carpentry that happened last winter.

Adam and I built this railing out for the loft entirely out of red oak milled up from our own trees

Adam and I built this railing out for the loft entirely out of red oak milled up from our own trees. The railing was built on the ground and installed as a unit. Adam’s measurements were, once again, spot on. With a few minor scrapes on the wall, it fit right in.

Our hired finish carpenter Bill

Our hired finish carpenter Bill D.

Master bedroom oak door.

Bill hung all of our interior doors. This one is the master bedroom door. The doors are a mix and match of showroom models that were resold through Renew in Brattleboro.

Working on the finish stairs to the third floor.

The finish stairs to the third floor were also installed by Bill.

 

 

 

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s