We’ve had the truck for a few weeks now–a ’97 GMC Sierra. Its a half ton v8.
Finally got the brakes replaced on the Nissan Sentra… it is still available for purchase.
Only a few more trees to take down. Then we will need to move the fire wood, chip the branches, and mill the largest trees.
So after a couple of weeks of steady work on the home design I have some results to share. The design below meets most of our requirements–although it is larger than we were shooting for–the interior footprint is 720 square feet.

View from the Northwest (Charles St.) We will need to be creative about how to dress-up the windowless North wall.
The floor plan below shows the beds with a desk on top of them. It actually is the other way around. The beds would/could be lofted to make space for the desk.
The height from the second floor to the peak of the roof is about 15 feet. This allows us to create 3rd floor loft space.
Here is how a hypothetical 2-panel system would perform at the center of the lot at ground level. The calculations are based on the shade analysis from the Solar Pathfinder (images available on an earlier post).
If one is interested in maximizing one’s wintertime gain, a 64 degree tilt is optimal. One can confirm this with the online program PVWatts 1 by plugging various tilt angles until arriving at the most wintertime energy gain.
The calculations show that the system will output on an average winter day about 49 gallons of hot water.
A comparative analysis:
Since we will need the most hot water during wintertime, it makes sense to tilt the panels to 64 degrees. Of course, if these were photovoltaic panels (generating electricity) this would not at all be the way to go.
Last night I dreamed that after taking down the trees the lot looked really nice… somehow I don’t think that will be the reality immediately. My friend Adam and I will be taking down the smaller trees on Feb 25th. I am meeting tomorrow (2-16-10) with another friend Sonny and a classmate of mine John to discuss when to do the bigger trees. My plan is to hire someone with a portable band-saw mill to come on site to mill as much of the wood as reasonable. There’s going to be a big pile of brush afterwords and I suppose I will have to rent a chipper. I have fantasies of having a workparty where everyone brings a pair of loppers and we go to town on the brush. It would be a couple hundred to rent the chipper and it would make a ton of noise and cause some pollution. Thoughts anyone?
-S
Working with Archicad gets one tied down in details. Working with graph paper cut-outs that represent rooms allows one to quickly rearrange the design. Hannah and I both liked this layout. The top setup is the second floor.
We shall soon see if this works out in Archicad.
Design Themes: Fun, organic, bring people together, atypical
Spaces: First Floor
Spaces: Second Floor
Spaces: First or Second Floor
Spaces: Accessory Building